The pool after washdown, its ready for water to be added
Surface Prep
Surface after the initial layer if Inter-Glass is installed. Next they will sand the surface, look for any areas that may need extra attention, in preparation for the final gel coat_
Prep Phase-Installing putty under the tile before surface is installed. This creates a smooth transition since tile is thicker than surface
Phase 2 Tile Installation
Phase 2 Tile Installation(2)
Phase 2 Tile Installation(1)
Installing the Inter-Glass
Installing the Inter-Glass(1)
Diamond Brite Resurfacing, Great Wolf Lodge – Kansas City, KS