Forsyth Neighborhood Pool Renovation | Fort Riley, Kansas

Project Overview

When the Forsyth Neighborhood Pool at Fort Riley began experiencing widespread failure of its recently installed interior finish, the facility needed more than a cosmetic repair, it needed a long-term solution. Shortly after a previous renovation, the plaster and waterline tile showed signs of bond failure, leaving hollow areas beneath the surface along with loose and missing tile.

Mid-America Pool Renovation was selected to restore the pool by removing the worn materials, properly preparing the existing shell, and installing a durable new finish designed to provide years of reliable performance. Located on a military installation, the project also required careful coordination, security compliance, and efficient execution to prepare the pool for the upcoming swim season.

Full Removal of the Existing Pool Surface
Full Removal of the Existing Pool Surface
Surface Prepped for New Tile & Plaster
Surface Prepped for New Tile & Plaster
New Waterline Tile Installation
New Waterline Tile Installation
Putting the finishing touches on the New Plaster Surface
Putting the finishing touches on the New Plaster Surface

Scope of Renovation

Inspection of the existing pool revealed that the interior finish had failed beyond what could be addressed with localized repairs. Rather than applying another finish over compromised materials, the project began with a complete hydroblasting process to remove the failed plaster layers and expose a sound substrate for the new finish.

The renovation included:

  • Hydroblasting to remove several layers of existing surface finish and prepare the existing shell for optimal plaster adhesion.
  • Installation of approximately 263 linear feet of new waterline tile.
  • Application of Finest Finish® Island Series White plaster finish.
  • Final quality inspection to ensure a durable, long-lasting finish.

By starting with proper surface preparation, the renovation addressed the root cause of the previous failure instead of simply covering it up.

Overcoming Project Challenges

One of the most important aspects of this project was determining why the recently installed interior finish had failed. While pools are often replastered over existing finishes using a bonding agent such as Bond Kote® when conditions are appropriate, that approach is only as reliable as the surface beneath it. If the existing plaster has already lost its bond to the concrete shell, a bond coat cannot correct the underlying problem. Instead, the new finish becomes dependent on a compromised substrate, greatly increasing the risk of future failure.

After evaluating the pool, Mid-America Pool Renovation determined that multiple layers of material needed to be completely removed before a new interior finish could be installed. Hydroblasting provided the thorough surface preparation necessary to create a strong bond between the existing concrete shell and the new plaster, helping ensure the long-term durability of the renovation.

Special Considerations

  • Completing a renovation of this size on an active military installation required extensive planning and coordination beyond the construction work itself.
  • Security-Cleared Crews: Crew members completed rigorous security vetting to gain access to the active base, allowing daily operations to proceed smoothly.
  • Heavy-Duty Debris Management: The project generated a significant amount of demolition debris, requiring five 20-yard dumpsters to completely remove the failed plaster.
  • Material Logistics: Two tractor-trailer loads of plaster materials and specialized equipment were carefully coordinated and staged to support the installation efficiently and keep the project on schedule for reopening.
Before-Plaster Popping off on the floor of the pool
Before-Plaster Popping off on the floor of the pool
Hydroblasted Surface after a Full Removal
Hydroblasted Surface after a Full Removal
After with New Waterline Tile & White Plaster Interior
After with New Waterline Tile & White Plaster Interior

The Finished Result

Today, the Forsyth Neighborhood Pool features a durable new interior finish, updated waterline tile, and the confidence that comes from addressing the underlying cause of the previous failure rather than applying another short-term fix.

The renovation restored both the appearance and long-term performance of this important community amenity, providing military families at Fort Riley with a beautiful pool ready to serve for years to come.

Project Details

  • Location: Fort Riley, Kansas
  • Pool Type: Military Installation Neighborhood Pool
  • Year of Renovation: 2026
  • Project Timeline: Winter preparation with spring installation
  • Scale: 11,000 square feet
  • Materials & Equipment Utilized: Finest Finish® Island Series White plaster, Ram Board, high-capacity dewatering tanks
  • Renovation Highlights:
    • Full hydroblasting to remove the failed interior finish and prepare the shell for a new plaster finish
    • Approximately 263 linear feet of new waterline tile
    • Finest Finish® Island Series White plaster
    • Five 20-yard dumpsters of demolition debris removed
    • Two tractor-trailer loads of materials and equipment coordinated
    • Security-cleared crews working on an active military installation

From The Customer

“Mid-America Pool Renovation exceeded our expectations throughout the entire replastering project at our Colyer Forsyth neighborhood pool. Their team was punctual, organized, and highly professional from start to finish. Communication was excellent—they kept us informed every step of the way and were always responsive to questions or concerns.

The crew worked deliberately and efficiently, maintained a clean worksite, and completed the project with exceptional attention to detail. Their pricing was fair and transparent, and the quality of the finished product was outstanding.

Since the renovation, the Colyer Forsyth pool has become one of the most visited and well-received pools among the five pools we manage. Mid-America Pool Renovation is a great option to any organization seeking a reliable contractor that delivers top-quality results.” — Joshua Perkins, Facilities Director

Like what you see? Contact us for your upcoming project!