In 2009, Mid-America Pool Renovation completed a pool renovation at Anne Arundel Community College. The project was triggered by a catastrophic plumbing failure that necessitated a complete strip-down of the facility to evaluate its structural integrity.
“The pool was filled and started, and is currently leak free and operating beautifully.”