Mid-America Pool Renovation performed a complete pool renovation and hydro-blasting prep to restore the aging Kovler Sea Lion Pool at Lincoln Park Zoo, which faced critical failure after 130 years of operation. The structure was losing over 20,000 gallons of water per day through numerous cracks and deteriorating seals.
The primary objective was to stop the massive daily water loss and restore the historic exhibit with a long-term, durable finish that could withstand constant animal activity and public viewing.
Mid-America Pool Renovation utilized a combination of specialized structural repairs and the INTER-GLASS® polymeric system to provide a fully bonded, watertight interior.
The pool was suffering from extensive deterioration of its existing coatings and sealants, along with unsightly short-term patches that had failed to address deep-seated structural issues.
Chicago, Illinois
7,930 Total Square Feet (Rock Features & Pool Surface)
Structural crack repair, epoxy injection, 40,000 psi water jetting, faux rock coating, and INTER-GLASS® polymeric resurfacing
40,000 psi Water Jetting unit, Armatec® EpoCem® coating, epoxy elastomeric penetrating resin, and integrally colored INTER-GLASS®
Kovler Sea Lion Pool (Zoo Exhibit)
130-year-old historic structure preservation
“The 4-FT high overflow ‘tunnel’ with remaining embedded shards from the deteriorating original iron construction forms presented the most challenging efforts for rehabilitation work.”