Mid-America Pool Renovation performed a complete pool renovation and hydro-blasting prep to restore the aging Kovler Sea Lion Pool at Lincoln Park Zoo, which faced critical failure after 130 years of operation. The structure was losing over 20,000 gallons of water per day through numerous cracks and deteriorating seals.
“The 4-FT high overflow ‘tunnel’ with remaining embedded shards from the deteriorating original iron construction forms presented the most challenging efforts for rehabilitation work.”