Mid-America Pool Renovation completed a specialized renovation project of an indoor swimming pool in 2008 at Southwestern Oklahoma State University. The pool was experiencing persistent leakage and surface deterioration but required a cost-conscious solution that avoided full circulation replacement or complete interior resurfacing.
The primary objective was to eliminate water loss from 16 failing inlet fittings and restore a clean, reflective finish to the heavily stained, fully tiled interior.
A targeted, phased approach was chosen, focusing on replacing deteriorated inlet fittings, repairing plumbing transitions, and restoring the integrity of the existing tile surface without the need for a full interior replacement
Rusted cast-iron and brass fittings, combined with degraded grout joints, had left the pool surface looking dull and brownish while causing significant daily water loss.
Weatherford, Oklahoma
4,671 Total Square Feet
Targeted plumbing replacement, pressure testing, tile repair and replacement, full regrouting, and surface restoration
Schedule 80 PVC, high-pressure water blasting, and ANSI & TCA standard tile grout
University Athletic Facility
Completed in 2008
“Final cleaning of the pool surface restored a beautiful blue reflective look from the tile finish.”