In 2012, Mid-America Pool Renovation restored the competition pool at Longview Community College, which had been plagued by a failing “cover-up” PVC membrane installed in 2006. The previous membrane-based solution failed within four months of its initial installation, leading to years of unsightly patches and structural issues.
The primary objective was to replace the failing, unbonded membrane with a permanent, fully-bonded resurfacing system to eliminate water accumulation under the liner and restore the pool’s professional appearance.
The college moved away from membrane liners in favor of the INTER-GLASS® system to achieve a durable, high-performance finish suitable for a competition environment.
The original decision to use a PVC membrane over a fully-bonded system in 2006 was based on a bid difference of only $1,018.
Lee’s Summit, Missouri
9,870 Total Square Feet
Complete removal of failing PVC membrane, UHP hydro-blasting, concrete repair, and full resurfacing with a fully-bonded system
40,000 psi (UHP) Hydro-blaster, concrete repair materials, racing lane tiling, and the INTER-GLASS® Reinforced Polymeric System
Community College Competition Swimming Pool
Completed in 2012
“In 2006, because of a difference of $1,018 in Bids, Longview Community College installed a cover-up PVC Membrane instead of a fully-bonded re-surfacing system… within 4-months of installation the Membrane lifted… requiring closure of the pool, total draining and repair.”