Mid-America Pool Renovation completely renovated the Olympic-regulated Recreation Center Lap Pool in Durango. This 333,000-gallon facility required precision work to maintain strict regulation standards while addressing a surface that had become significantly etched. The project was strategically scheduled during the center’s annual maintenance period, requiring a rapid turnaround to minimize facility closure for the community
Renovated in 2022.
Replace the rough, etched surface and modernize approximately 1,350 square feet of tiled racing lanes and targets.
The facility selected a Complete Pool Renovation and a Plaster & Cement-Based Surfaces upgrade, specifically choosing the SunStone Antigua finish for its durability and aesthetic appeal.
The original surface had deteriorated to the point where simple repairs were no longer sufficient, requiring a full replacement to meet high-traffic recreation standards
Durango, Colorado
8,753 Total Square Feet
Completely renovating the 333,000-gallon Olympic-regulated lap pool, including tile-over-tile racing lanes and SunStone resurfacing
SunStone Antigua interior finish, bonding agent, and blue ceramic tile
Municipal Recreation Center
Completed in two weeks during October 2022
“The work needed to be completed in a short and specific timeframe during the recreation centers annual maintenance period.”