University of Colorado-Colorado Springs | Colorado Springs, CO

Project Overview

As part of a larger renovation of the University of Colorado Colorado Springs aquatic facility, the university sought to restore the appearance and long-term performance of its indoor competition pool. During the preconstruction evaluation, Mid-America Pool Renovation identified that the existing finish had multiple layers of plaster with widespread delamination, or “pop-offs,” making a standard replaster insufficient.

Mid-America worked closely with the university to develop a renovation scope that addressed the underlying issues while aligning with their budget and long-term goals. By recommending complete hydroblasting and a new interior finish, along with targeted upgrades throughout the pool, the team helped deliver a solution designed to last and backed by a warranty the university could rely on.

Hydroblasting Surface Prep
Hydroblasting Surface Prep
350 Linear Feet Coping Pour
350 Linear Feet Coping Pour
Coping Detail
Coping Detail
New Racing Lanes
New Racing Lanes

Scope of Renovation

During the preconstruction evaluation, it was determined that the existing plaster could not simply be resurfaced. Two deteriorated layers of plaster had lost their bond with the underlying concrete shell, requiring complete removal before a new finish could be installed.

The renovation included:

  • Protecting the surrounding facility by layering the pool deck with Ram Board and utilizing full containment tenting for complete dust control
  • Stripping away two full layers of failing plaster via high-capacity hydro-blasting to reach the original substrate
  • Executing advanced electrical bonding and setting new structural anchors
  • Demolishing and replacing 350 linear feet of deteriorated perimeter concrete coping
  • Operating an eco-friendly wastewater management system with a dewatering tank to process runoff, allowing the clean solid materials to be fully recycled at a local quarry
  • Installing a brand-new wall step system to improve swimmer accessibility
  • Replacing all 360 square feet of competitive racing lanes and target
  • Resurfacing the extensive 7,700-square-foot interior footprint with premium SGM Oyster Quartz Diamond Brite aggregate
  • 350 Linear feet of poured concrete bullnose coping

Together, these structural repairs and premium finishes completely eliminated the underlying adhesion issues while transforming the room into a bright, modern athletic environment.

Overcoming Massive Concrete Pours & Tight Trade Coordination

This project was completed alongside several other improvements taking place throughout the natatorium, requiring close coordination with multiple contractors and a flexible installation schedule. Although the resurfacing was originally planned during the university’s holiday break, Mid-America adjusted its schedule to accommodate delays from other trades, ensuring the work was completed without compromising quality.

Replacing the pool coping added another layer of complexity. Before the continuous concrete pour could begin, the crew installed new anchors, completed the required electrical bonding, and carefully prepared the perimeter of the pool. Due to the indoor location and limited access points, concrete placement required careful coordination and manual handling to move material into position. The finished coping not only improved the durability of the pool but also created a brighter, more updated appearance throughout the facility.

After Hydroblasting & Coping Demo
After Hydroblasting & Coping Demo
New Colored Concrete Coping
New Colored Concrete Coping
After with New Colored Concrete Coping, Tiled Racing Lanes & Quartz Diamond Brite Interior
After with New Colored Concrete Coping, Tiled Racing Lanes & Quartz Diamond Brite Interior

The Finished Result

Our work on the UCCS athletic pool successfully contributed to the university’s larger facility modernization, delivering a highly durable swimming space built for heavy campus use. By focusing on a long-lasting surface bond, this project ensures the pool remains a top-tier asset for the student body.

With its brilliant white quartz finish, meticulously poured custom coping, and updated infrastructure, the project demonstrates how an aging campus facility can be completely revitalized into a show-stopping asset that the university can showcase with absolute pride.

Project Details

  • Location: Colorado Springs, Colorado
  • Pool Type: University Athletic and Recreation / Commercial
  • Year of Renovation: 2026
  • Project Timeline: 3 to 4 weeks for pool-specific execution within a larger multi-month facility remodel
  • Renovation Highlights:
    • Heavy-duty deck protection and indoor dust containment tenting
    • Complete removal of two plaster layers via high-capacity hydro-blasting
    • Sub-surface electrical bonding and updated structural safety anchors
    • Demolition of 350 linear feet of deteriorated perimeter coping
    • On-site wastewater filtering and eco-friendly debris recycling
    • Installation of a new wall step accessibility system
    • Replacement of 360 square feet of tiled racing lanes and targets
    • Full interior resurfacing with premium white quartz aggregate
    • 350 linear feet of continuous poured concrete bullnose coping

From Our Team

“This was a great job for us and the finished product was some of our best coping to date.”