As part of a comprehensive facility modernization, the University of Colorado-Colorado Springs (UCCS) commissioned a comprehensive overhaul of its indoor aquatic center. The project focused on brightening the space and correcting significant bonding failures in the pool’s previous finishes. The scope evolved from a standard resurfacing to include the total demolition and replacement of the pool’s concrete coping to ensure a “freshened up” aesthetic for the entire room.
“This was a great job for us and the finished product was some of our best coping to date.”