Historic Restoration, Gorman Park Pool – Kansas City, MO

Renovation Plan “How it was done” According to the Kansas City Parks & Recreation Department, Gorman Park was named after Anita B. Gorman, who focused much of her life to conservation efforts, and civic and community improvements. Gorman Park was named after Anita Gorman in 1991. The Gorman Park pool was operated by the YMCA […]
A Long Term Solution, University of Missouri Lap Pool – Columbia, MO

Project Assessment “What needed to be done” Built in 2005, the Mizzou Aquatic Center at the University of Missouri houses four swimming pools, the most notable being the Olympic sized, 50-meter competition lap pool. Originally constructed of a solid concrete base with a plaster interior surface, the University decided to undergo construction to restore this […]
Memory Square Pool | Louisville, CO
Ripped PVC Membrane Finds Permanent Solution, Quality Inn – Belton, MO

Project Assessment “What needed to be done” This Quality Inn pool was originally constructed with galvanized walls, a vermiculite floor pool, and fiberglass molded entry steps. The pool was then covered with a vinyl liner. A few years after construction, the vinyl liner ripped, folds in the liner began to appear throughout the pool, and […]
Great Wolf Lodge | Kansas City, KS
Long-awaited Diamond Brite Resurfacing, Roosevelt Swim Center – Rapid City, SD

Project Assessment “What needed to be done” The cement surface of the Leisure Pool at the Roosevelt Swim Center was 17 years old! Cement-based surfaces typically last for about 5-10 years so a resurfacing was much needed. In addition to the age of the surface, its issues were further exacerbated during the shut down due […]